1 year ago. January 2, 2023 at 8:17 PM
Well, I'm finally moving towards installing my shower cabinet in the playroom.
I already have the shower tray, glass side panels, door and fittings.
It is a corner tray with 1m sides, so should be more than big enough for two to play inside.
I have ordered black PVC wall panels, and black stainless steel D ring anchors for wall restraints. There are already four D ring anchors on the ceiling above the area of the shower.
I also ordered TWO thermostatic mixer units. I will install one for the shower head and one for a separate douche so they can be used together with different temperatures.
Once the shower is fitted and sealed, I can get my rubber flooring installed.
I'll have it completed before I get my slave.