Well the new shower is being installed this coming week.
A new rectangular corner 1200x900 (4ft x 3ft) slate effect tray, a black framed glass sliding door on the 1200 side and a glass end panel on the 900 end
I have done the ceiling and fitted nine load bearing D rings in an array on the ceiling just inside a 1200 x 900 rectangle in the corner. and finished with black marble PVC panneling.
When the bathroom next door was replaced a few months ago, the plumber ran hot, cold and waste pipes under the connecting wall to where the shower is going to be installed.
The shower tray will be raised by around 100mm from the floor on a plinth and the walls done with black specked PVC panels.
I have TWO completely separate thermostatic mixer units running from a hot (tank) and cold feed One is for a shower head and the other for an anal douche so it can run at a lower temperature at the same time as i’m showering or playing.
Another of my fetishes is showering and playing in full wet gear and i’m going to get a new suspension harness and a canvas sling to fit inside the shower.
I will update with photos once the job is done
After that I just have to finish the playroom flooring……..